- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
projectmemorandum
Project Memorandum
Paradise Area Reinforcement Project
To: Roosevelt Grant, CPUC
From: Matt Fagundes, Deputy Project Manager
Date: February 8, 2002
Re: Mitigation Monitoring Report No. 12: December 29, 2001 – February 1, 2002
The following descriptions of compliance and monitoring activities for the Paradise Area Reinforcement Project are from project summary reports supplied to Aspen Environmental Group (Aspen) by PGE Co. (PGE), a site inspection conducted by Aspen on January 15, and personal communications between Matt Fagundes of Aspen and Armen Keochekian of Essex Environmental (PGE Environmental Inspector).
Summary
This Mitigation Monitoring Report provides a general update of construction activities associated with the Paradise Area Reinforcement Project. It also describes mitigation measures that have been implemented to date in accordance with the Project’s Mitigated Negative Declaration. More detailed mitigation compliance information is in the accompanying table prepared by PGE. This table is updated on a monthly basis, with completed items indicated with asterisks. This report represents all activities from December 29, 2001 to February 1, 2002.
Work conducted during this time period was primarily associated with stringing the power line on the previously installed tubular steel poles. PGE’s Environmental Inspector has indicated that construction activities associated with the project are anticipated to be complete by March 1, 2002. However, it is anticipated that PGE will be conducting clean-up activities along the project right-of-way, including restoration to the Trailway, through mid March.
Construction Activities
Power Line Construction
The power line crew remobilized to the project site after the holidays on January 4 to resume stringing activities. The majority of work on this day focused on preparing the two pull sites (located at the transition point between segments 3 and 4 and adjacent to the Paradise Subs
您可能关注的文档
- prof.deepankarchoudhury,ph.d.,figs,fiset,.doc
- prof.dr.sci.svetlozar(zari)rachev–curriculumvitae.doc
- prof.stanislavpejovic,ph.d.,p.eng.doc
- professionalpaper.doc
- professorhelenvalerieatkinson,ba,ma,phd,drhc,freng.doc
- proformacontractmanagementforms.doc
- proformafortheaffiliationwith.doc
- programannouncement.doc
- programmecommittee.doc
- programmingexercisessubmissiondeadline2359,12oct.doc
- 2025年中国数据及图像传输设备市场数据调查、监测研究报告.docx
- 2025年中国橡塑海绵制品市场数据调查、监测研究报告.docx
- 2025年中国烛石市场数据调查、监测研究报告.docx
- 2025年中国栏杆座市场数据调查、监测研究报告.docx
- 2025年中国抱心狮虎豹市场数据调查、监测研究报告.docx
- 2025年中国金属滤片市场数据调查、监测研究报告.docx
- 2025年及未来5年中国手推式带桶喷雾机市场现状数据分析及数据监测报告.docx
- 2025年及未来5年管道弹性托架项目市场数据调查、监测研究报告.docx
- 2025年及未来5年七彩双层笔盒项目市场数据调查、监测研究报告.docx
- 2025年及未来5年中国染色棉锦弹力平纹布市场分析及数据监测研究报告.docx
文档评论(0)