skem0901–skemptonl0andl1refurbishment.docVIP

  1. 1、本文档共39页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
skem0901–skemptonl0andl1refurbishment

 SKEM 0901 – Skempton L0 and L1 refurbishment Project Close-Out Plan SKEM 0901 – Skempton L0 and L1 refurbishment September 09 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party Ove Arup Partners Ltd 13 Fitzroy Street, London W1T 4BQ Tel +44 (0)20 7636 1531 Fax +44 (0)20 7755 2143 124369-00 Document Verification Page 1 of 1 Job title Skempton Levels 0 and 1 Fitout Job number 124369-00 Document title Project Close Out Plan File reference 4.03 Reports Document ref Revision Date Filename 2009 05 29 project close out plan DRAFT.doc Draft 29 May 09 Description Draft close out plan for discussion 1 June 09 ICL workshop. Prepared by Checked by Approved by Name Celia Smith Signature Revision 1 September09 Filename 2009 09 14 project close out plan Rev 1.doc Description Revised to incorporate updated phasing and ICL comments. Prepared by Checked by Approved by Name Celia Smith Mike Joshua Mike Joshua Signature Filename Description Prepared by Checked by Approved by Name Signature Filename Description Prepared by Checked by Approved by Name Signature Issue Document Verification with Document ( Contents Page Objectives 1 Definitions 1 Distribution list 1 Project Close-Out Activities – Status, Roles Responsibilities Matrix 2 Project Close-Out Programme 2 1 Construction Completion – Key Milestones 3 1.1 Milestone 1 – Phase 1A architectural completion 3 1.2 Milestone 2 – Phase 1B architectural completion 4 1.3 Milestone 3 – Phase 1C architectural completion 4 1.4 Milestone 4 – Phase 1D architectural completion 5 1.5 Milestone 5 – Phase 1E architectural completion 5 1.6 Misc other Phase 1 spaces a

文档评论(0)

jvdodnnv002 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档