tucsonelectricpowerco.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
tucsonelectricpowerco

Tucson Electric Power Co. Interconnection Requirements For Distributed Generation TABLE OF CONTENTS 1. Scope 2 2. DEFINITIONS 2 3. OVERVIEW OF DISTRIBUTED GENERATION ISSUES 4 4. DISTRIBUTED GENERATION TYPES 5 5. GENERAL INFORMATION REQUIREMENTS 7 6. DESIGN CONSIDERATIONS AND DEFINITION OF CLASSES 9 7. INTERCONNECTION TECHNICAL REQUIREMENTS 10 8. APPLICATION PROCESS AND DOCUMENTATION REQUIREMENTS 17 9. TESTING AND STARTUP REQUIREMENTS 18 10. OPERATIONAL AND MAINTENANCE REQUIREMENTS 19 EXHIBIT 1: POWER QUALITY CHARACTERISTICS 21 EXHIBIT 2: TEP RELAY SETTINGS AND RE-CLOSING PRACTICES 22 EXHIBIT 3: DG APPLICATION PROCESS 23 EXHIBIT 4: TEP HOLD TAG 24 APPENDIX: APPLICATION AND EQUIPMENT INFORMATION FORM 25 1. scope This document specifies Tucson Electric Power Company (TEP, or utility) requirements for safe and effective interconnection of a Distributed Generator with a utility radial distribution system. Interconnection requirements as outlined here are for those installations that will be connected to TEPs electric power distribution and/or transmission systems. A Distributed Generator must also comply with WSCC (Western Systems Coordinating Council), ACC (Arizona Corporation Commission), AZISA (Arizona Independent Scheduling Administrator), NERC (North American Electric Reliability Council), FERC (Federal Energy Regulatory Commission) and RTO (Regional Transmission Operator) requirements as applicable. Facilities that will be connected directly to the transmission system will be reviewed by the utility on an individual basis. This Agreement does not provide for nor include transmission service. The availability of transmission service on the transmission system may not be inferred or implied from TEPs execution of this Agreement. Transmission service on the transmission system is available pursuant to the TEP OATT. For the purpose of simplicity, the term Customer will be used here to refer to a utility

文档评论(0)

jvdodnnv002 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档