并网光伏电站置信容量评估.pdfVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
并网光伏电站置信容量评估.pdf

第 36 卷第 9 期 2012 年 9 月 电网技术 Power System Technology Vol. 36No. 9 Sep.2012 文章编号: 1000-3673 (2012) 09-0031-05 中图分类号: TM72 文献标志码:A 学科代码: 470.4051 并网光伏电站置信容量评估 方鑫,郭强,张东霞,梁双 (中国电力科学研究院,北京市海淀区 100192 ) Capacity Credit Evaluation of Grid-Connected Photovoltaic Generation FANG Xin, GUO Qiang, ZHANG Dongxia, LIANG Shuang (China Elec位ic Power Research Institute, Haidian District, Beijing 100192, China) ABSTRACT: To evaluate the capacity credit of photovoltaic (PV) generation is one of urgent problems to be considered when large-scale PV station is connected to traditional power grid. The capacity credit of PV generation is evaluated by the generation capacity that could be reduced in 位aditional power grid .after the grid-connection of PV station. For 也is p四pose, a new method for evaluating the capacity credit of PV generation is proposed. Firstly, an annual output fluctuating model of PV generation, in which the occurrence probabilities of different weather typ邸, the maximum proportions of solar radiation under various whether conditions, the fluctuation radiation range due to clouds mask and the temperature coefficient random variation range are taken into account, is built; secondly, based on sequential Monte-Carlo simulation, a methodωcalc由能 generation reliability of power grid is put forward and its 01加ctive function is established based on the 1088 of load expectation (LOLE) before 阻d after the grid-connection of PV station, and then the p缸ticle 8W缸m optimization is utilized to search optimal combination of traditional generation sets to make the generation reliability level of power grid co帅rming with that before the grid-connection of PV station. Bo吐1 correctness and effectiveness of the proposed model and algorithm 缸e verified by simulation results ofIEEE-RTS79 system .. KEY WORDS: photovoltaic (PV);ωpacity crediζgeneration reliability; s叫uential Monte-Carlo; 归rticle swarm optimization 摘要z衡量光伏发电的置信容量是大规模光伏电站接入电网 时需要考虑的问题之→。以光伏发电接入后系统可以

文档评论(0)

yingzhiguo + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:5243141323000000

1亿VIP精品文档

相关文档