- 1、本文档共37页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
单元一-正修科技大学工业工程与管理系所
Abstract The case company G is a Taiwan firm with more than USD 250 million turnovers and over 1250 employees worldwide. But, company G confronted much trouble in selecting a fitting KM strategy that involved several complex factors systematically, such as: the purposes, the condition of resources and capabilities, and even the preferences of company. In this research, an empirical study is presented to illustrate the application of the proposed method for evaluating and selecting a favorable KM strategy. The proposed method Step 1: Defining the decision goals - to select a favorable KM strategy Step 2: Establishing evaluation clusters - three primary purposes of KM six important factors for evaluating KM strategies three styles of KM strategies Step 3: Applying an ANP model ANP handles dependence within a cluster (inner dependence) and among different clusters (outer dependence). Secondly, the ANP is a nonlinear structure, while the AHP is hierarchical and linear with a goal at the top level and the alternatives in the bottom level. In the feedback system model, evaluation clusters link one by one in turn as a network system. it is usually hard to obviate the possibility of interactions within the sub-criteria cluster. The looped arc signifies the inner dependences. Step 4: Selecting the optimal solution The unweighted supermatrix W (Fig. 2) contains the local priorities derived from the pairwise comparisons throughout the network. To derive the overall priorities of elements, we need to multiply submatrices numerous times in turn, until the columns stabilize and become identical in each block of submatrices. The overall normalized priorities were obtained: WC = (C1, C2, C3) = (0.337, 0.318, 0.345), WS = (S1, S2, S3, S4, S5, S6) = (0.173, 0.178, 0.176, 0.175, 0.154, 0.144), WA = (A1, A2, A3) = (0.291, 0.350, 0.360). Discussion Each KM strategy emphasizes its own specific KM purpose: strategy A1 cast highlight at the activating information (C1) of 0.425
文档评论(0)