eugenics优生学(eugen产出ics产生优秀〔后代〕优秀生).doc

eugenics优生学(eugen产出ics产生优秀〔后代〕优秀生).doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
This engineering knows well to see attach table 5 《use an earths surface at the time 》 with a ground of need plan at the time. 3.8The main material plans The main material plans detailed see attach table 6. 3.9The construction flat surface sets out 3.9.1The facilities sets out at the time For easy to management, the construction all establishes fence on all sides on the scene, lord the entrance is established to a northern side.According to the engineering places condition, Main production and transact facilities Be placed to east noodles and northern side, live facilities mainly Be placed to southwest side.Concrete decoration detailed see attach diagram 《Start construction total flat surface decoration diagram 》 . 3.9.2Start construction road The construction is on the scene inside lord road along with design a permanent road decoration, the road breadth presses the 6 m consideration and pay the road circumambience construction facilities and building Thing decoration, the road breadth presses the 4 m consideration.Do an exit bed first, the top mat goes together with freestone or stove by thick 20 cm of residue, the wayside should establish Place to drain ditch.Moreover in consideration of the whole place drains and starts construction to do a 5 ?s catchment ascent on the scene and lines up water into wayside catchment ditch, Again line up into the spot sewer. 3.9.3The construction is used water and used an electricity According to the calculation, the items construction is about used to give or get an electric shock total capacity a 220 kvas, the construction cloth line considers 3 back tracks and produce Use to give or get an electric shock 2 back tracks, all choose BLX3 × 75|2 ×s 50 rubbers insulate aluminum line, the life transacts and illuminates to choose BLX3 with the electricity × 35| one × 16 rubbers insulate aluminum line, the electric wire considers building on stilts to spread to establish.Another consideration provides with one set 120 kW generator bac

您可能关注的文档

文档评论(0)

haihang2017 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档