- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Waste-to-energy plant for paper industry sludges disposal technical-economic study
Journal of Hazardous Materials B81 (2001) 265–283
Waste-to-energy plant for paper industry sludges
disposal: technical-economic study
Antonio C. Caputo, Pacifico M. Pelagagge
?
Faculty of Engineering, University of L’Aquila, 67040 Monteluco, L’Aquila, Italy
Received 1 August 2000; received in revised form 1 November 2000; accepted 4 November 2000
Abstract
In this work, a detailed technical-economic analysis of a fluidized bed based waste-to-energy
system for disposal of paper manufacturing sludges has been carried out. Specific reference is made
to a case study represented by the largest plant in Italy producing recycled paper, with a daily sludge
output of about 52 t.
The adopted plant has been sized for a nominal capacity of 140 t per day also allowing the
progressive elimination of sludges accumulated in a previously utilized landfill, giving a nominal
electrical power output of 3.5 MW.
The main plant sections have been described and the adopted technical solutions have been out-
lined. A detailed process and equipment characterization has been carried out leading to a thorough
evaluation of capital investment, operating costs and revenues. A differential analysis has been
performed with respect to the alternative solution represented by the disposal of untreated sludges
in an external landfill in order to highlight the savings obtainable. The economic profitability of
the investment has been evaluated regarding several performance indices. The economic evaluation
has been completed by a sensitivity and risk analysis in order to assess the effects of uncertainties
in the economically significant parameters. Adopting most probable values, the savings obtained
with the considered waste-to-energy system are evaluated in the 15–20 million Euro range during
the estimated plant life of 15 years with a foreseen pay back time of 4 years. Moreover, many envi-
ronmental benefits result such as the remediation of existing landfill, the avoidance of new landfills
opening and
您可能关注的文档
- Single-particle spectral function of quarter-filled ladder systems.pdf
- SLT02-MCPwirelessinfrastructure-Bhide-final.pdf
- Solving Polynomial Systems Using a Branch and Prune Approach.pdf
- Sludge Treatment in China.pdf
- SMITH_TECHNICAL BIT PROPOSAL_GIGANTE 3_AGOSTO 01 2011.pdf
- SP0472-2010.pdf
- Space-Efficient Gradual Typing.ppt
- South Africa Apparthide power point.ppt
- Runtan Metal Tech Info.pdf
- Spectroscopic Studies of Extremely Metal-Poor Stars with the Subaru High Dispersion Spectro.pdf
- Waste_Incineration_China 垃圾焚烧.pdf
- Water Quality and Health Bureau Healthy Environments and Consumer Safety Branch.pdf
- Waters2695 Trouble Shooting Guide.pdf
- We need to protect animals 齐汝梅.ppt
- Web-based Customer Management of VPNs.pdf
- Weight-for-age percentiles Boys, birth to 36 months.pdf
- Welcome to our world.ppt
- Welcome to Suzhou.ppt
- Why cannot a pig see the sky.pptx
- WHY FIRMS ADOPT ANTITAKEOVER ARRANGEMENTS LUCIAN ARYE BEBCHUK.pdf
最近下载
- 1.2.4绝对值 课件 2025-2026学年人教版数学七年级上册.pptx VIP
- QGDW 11651.13-2017 变电站设备验收规范-第13部分:穿墙套管.pdf VIP
- 电子商务客服教案课程.doc VIP
- 客服培训课程小游戏.pptx
- QGDW 11651.12—2017变电站设备验收规范-第12部分:母线及绝缘子.pdf VIP
- 中国食用油行业现状分析-小包装食用油市场潜力巨大
- 分散式风电工程施工组织设计.doc VIP
- 定价策略与渠道价格管理8.doc VIP
- 透析患者高磷血症的控制37页PPT.pptx VIP
- QGDW 11651.10-2017 变电站设备验收规范-第10部分:干式电抗器.pdf VIP
文档评论(0)