how_to_run_and_cement_liners_part_4
Glenn R. Bowman, Regional Drilling Superintendent, Ashland Ex-
ploration, Houston, and Bill Sherer, Operations Manager, Liner
Tools LC and formerly Alexander Oil Tools, Houston
ASSUMING A USABLE HOLE has been drilled and correct equipment
has been selected, as discussed in the first three installments of
this series, it is now time to run and cement the liner. In this in-
stallment a recommended running procedure is given in addition
to the description of an unusual phenomenon that can occur and
possibly startle the rig site supervisor. Finally, preparations for
testing the liner are discussed.
LINER RUNNING PROCEDURES
The following procedure is taken from API Bulletin D17. The
reader will note that it should be modified if the intent is to
reciprocate or rotate the liner. The procedure is as follows:
1. Run drill pipe and circulate to condition hole for running liner.
Temperature subs should be run on this trip if bottomhole circu-
lating temperatures are not known. Drop hollow rabbit (drift) to
check drill pipe ID for proper pump down plug clearance. On trip
out of hole, accurately measure and isolate drill pipe to be used
to run the liner. Tie off remaining drill pipe on other side of the
racking board.
2. Run ______ ft of _____ liner with float shoe and float collar
spaced _____ joints apart. Run liner plug landing collar _____
joints above float collar. Volume between float shoe and plug
landing collar is _____ bbl. Sandblast joints comprising the lower
1,000 ft and upper 1,000 ft of the lner. Run thread locking com-
pound on float equipment and bottom eight joints of liner. Pump
through the bottom eight joints to be certain that float equipment
is working.
3. Fill each 1,000 ft of the liner while running, if automatic fill
up type equipment is not used.
4. Install liner hanger and setting tool assembly. Fill dead space
(if pack-off bushing is used in lieu of liner setting cups) between
liner setting tool and liner
您可能关注的文档
- GRE阅读经典试题汇总资料(五)-智课教育旗下智课教育.pdf
- GRE阅读经典题库(三)-智课教育旗下智课教育.pdf
- GRE阅读经典题库(四)-智课教育旗下智课教育.pdf
- GRE陈虎平阅读36套-18-智课网.pdf
- GridView无代码分页排序.doc
- GROWTH AND YIELD OF A TROPICAL RAIN FOREST IN THE BRAZILIAN AMAZON 13 YEARS AFTER LOGGING.pdf
- GRE词汇红宝书多种记忆法-智课教育旗下智课教育.pdf
- GRE阅读高频题目:Supernova-智课教育旗下智课教育.pdf
- Growth promotion and yield enhancement of peanut (Arachis hypogaea L.) by application of plant growt.pdf
- GTE6-N1231.pdf
文档评论(0)