how_to_run_and_cement_liners_part_5.pdf

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
how_to_run_and_cement_liners_part_5

5.1 If a leak does exist in a liner and the decision is made to squeeze the shoe, there is a risk of setting the packer below the leak, which could cause one of three things to happen. Either squeeze cement will be applied to the shoe where it is not needed; or ce- ment could channel around the liner and through the leak back into the pipe putting cement on top of the packer; or the packer (if set below the leak) would effect a good leakoff test, thus hid- ing the leak. The latter possibility could be avoided by pressur- ing up on the annulus above the packer to the fracture gradient of the shoe. This will also help avoid collapsing the casing above the packer with high squeeze pressures. Since the test pressure inside a liner should at least exceed the fracture gradient at the shoe, it would be prudent to apply this same pressure to the liner overlap before it is drilled out and the shoe tested without a packer. Otherwise, a leakoff test on the shoe (if it is a drilling liner) may breakdown the overlap and the operator will again not know for sure where the leak occurred. Another negative aspect of testing liners without packers is that test pressure must not exceed the unknown burst rating of the intermediate casing, especially if mud density is great- er inside the intermediate than outside (this is the case when most liner are set). If substantial casing wear is suspected, test- ing without packer should be considered risky. Wear would be suggested in directional holes when long periods of time are spent drilling inside casing; when intermediate casing is through high dog-legs; and when internal mud weights and circulating temperatures are high while drilling below intermediate cas- ing,1,21,23, etc. In addition, the increase in tension due to ballooning during pressure testing should be checked to ensure that tensile rating of the intermediate casing is not exceeded. The following example illustrates the calculations that s

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档