- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
workshop1-cant-beam
Workshop 1
Linear Static Analysis of a Cantilever Beam
Introduction
In this workshop you will become familiar with the process of creating a model
interactively by using ABAQUS/CAE. You will use the ABAQUS/CAE modules to
create the cantilever beam model shown in Figure W1–1.
Figure W1–1. Cantilever beam
Preliminaries
1. Start a new session of ABAQUS/CAE from the workshops/beam directory by
entering abaqus cae at the prompt.
2. Select Create Model Database from the Start Session dialog box.
3. To create a model, select Model?Create from the main menu bar and enter the
name BEAM in the Create Model dialog box. Click Continue. Accept the
defaults in the Edit Model Attributes dialog box. Click OK.
4. To save the model database, select File?Save As from the main menu bar and
enter the name BEAM in the Selection line of the Save Model Database As
dialog box. Click OK.
The .cae extension is added automatically.
Creating a part
The first step involves creating a three-dimensional, deformable solid body by sketching
the two-dimensional profile of the beam (a rectangle) and extruding it.
1. From the Module list located under the toolbar, select Part to enter the Part
module, as shown in Figure W1–2.
Figure W1–2. Module list
5. From the main menu bar, select Part?Create to create a new part.
The Create Part dialog box appears.
6. Name the part Beam. Accept the default settings of a three-dimensional,
deformable body and a solid, extruded base feature in the Create Part dialog
box. In the Approximate size text field, type 300.
7. Click Continue to exit the Create Part dialog box.
ABAQUS/CAE displays text in the prompt area near the bottom of the window to guide
you through the procedure, as shown in Figure W1–3. Click the cancel button to cancel
the current task; click the backup button to cancel the current step in the task and return to
the previous step.
Figure W1–3. Prompt area
The Sketcher toolbox appears in the left side of the main window, and the Sketcher grid
ap
您可能关注的文档
- Using a mixture of n-best lists from multiple MT systems in rank-sum-based confidence measu.pdf
- Using brackets to improve search for statistical machine translation.pdf
- Using Geometrical Image Analysis to Compute Multi-Mode Fiber Coupling Efficiency.doc
- Using advice to transfer knowledge acquired in one reinforcement learning task to another.pdf
- Using Interval Arithmetic To Model Finite Domain CSPs Where Domain Generation Is Expensive.pdf
- Using Markov Decision Processes and Reinforcement Learning to Solve the Remote Versus Local.pdf
- Using Ontology to Solve the Consistency Problems in Collaborative Writing.pdf
- Using the future to sort out the present Rankprop and multitask learning for medical risk e.pdf
- USW Internal English test_v19.pdf
- Using the h-index to rank influential information scientists.pdf
最近下载
- 江苏开放大学大学英语(B)(1)形成性考核作业1.docx
- 思辨与创新智慧树知到期末考试答案章节答案2024年复旦大学.docx
- 核电阀门基本知识培训教材.ppt VIP
- 中医肿瘤治疗课件.pptx VIP
- 火山引擎IDC2025大模型应用落地白皮书74页.pdf
- 小学生劳动教育《从小爱劳动》主题班会ppt课件.pptx
- 2025吉林长春市总工会公招聘工会社会工作者(107人)招聘笔试备考试题及答案解析.docx VIP
- GB51016-2014 非煤露天矿边坡工程技术规范.pdf
- 2018-2023年山东信息职业技术学院高职单招(数学/语文/英语)历年常考试题库含答案解析.docx
- 教科版六年级科学下册全册同步练习含答案.pdf
文档评论(0)