- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 68
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- 全国茶产业发展规划.doc
- 全国设工程工程量清单计价规范.doc
- 全国自学考试管理心理学试题答案.doc
- 全国设工程造价员资格考试测试题.doc
- 全国自学考试物流企业财务管理试题答案.doc
- 全国自学考试管理学原理试题及答案.doc
- 全国释清单计价规范.doc
- 全国高等教育自学考试历试题及答案财务管理学试题.doc
- 全国计算机等级考试四级网工真题.doc
- 全国铁企业生产经营一览表.doc
- 病患教育在疾病预防中的实践与效果.pptx
- 黑龙江省肇东市事业单位考试(医疗卫生类E类)职业能力倾向测验重点难点精练试题参考答案.docx
- 妇科疾病诊断与治疗策略探讨与优化应用.pptx
- 皮肤科护理与患者教育技巧.pptx
- 重症监护病房护理质量改进.pptx
- 黑龙江省文化厅所属事业单位2025招聘工作人员历年高频难、易点(公务员考试共500题)模拟试卷推荐.docx
- 黑龙江省鹤岗市行政职业能力测验模拟试题(能力提升).docx
- 黑龙江省铁力市事业单位考试职业能力倾向测验(综合管理类A类)强化训练题库推荐.docx
- 黑龙江省穆棱市职业能力倾向测验事业单位考试(自然科学专技类C类)试题带答案.docx
- 黑龙江省穆棱市事业单位考试(自然科学专技类C类)职业能力倾向测验重点难点精练试题汇编.docx
文档评论(0)