- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
/
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel p
您可能关注的文档
- 参建位管理人员考试卷答案.doc
- 友达电环境安全卫生政策.doc
- 参考案详细解析与案例分析提示章.doc
- 双汇团企业环境分析.doc
- 双电自备电源管理办法.doc
- 双江道两危”安全生产专项整治方案.doc
- 双氧市场分析.doc
- 参建位管理人员考试卷答案.doc
- 双边场与对冲交易的影响、挑战与前景.doc
- 反思有资本经营预算法律制度的目标定位.doc
- 2025年演出经纪人演出数据跨境流动法律问题专题试卷及解析.pdf
- 2025年信息系统安全专家物联网安全日志分析专题试卷及解析.pdf
- 2025年信息系统安全专家云环境持续安全监控专题试卷及解析.pdf
- 2025年信息系统安全专家ISMS内部审核流程与技巧专题试卷及解析.pdf
- 2025年演出经纪人艺人定位与数据化运营策略专题试卷及解析.pdf
- 2025年演出经纪人商务谈判中的僵局处理与冲突化解专题试卷及解析.pdf
- 2025年演出经纪人国际演出合同纠纷解决机制专题试卷及解析.pdf
- 2025年注册项目管理师蒙特卡洛模拟在敏捷项目迭代周期估算中的应用专题试卷及解析.pdf
- 2025年AWS认证子网与AWSSimSpaceWeaver仿真网络专题试卷及解析.pdf
- 2025年AWS认证SQS与EMR集群任务调度专题试卷及解析.pdf
原创力文档


文档评论(0)