- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
推行细化管理,节约项目管理成本
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 16
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- 抚顺市总体规划.doc
- 招商理与商业地产的运营.doc
- 招商工作手册大纲.doc
- 招商理岗位职责.doc
- 招商行的人力资源管理.doc
- 招商物流:运输过程透明管理案例.docx
- 拓展练:高级企业培训师教材.doc
- 招投与合同管理教案.doc
- 拍摄作餐饮广告片解析餐饮文化的境界.docx
- 招投管理细则.doc
- 湖北省宜昌市五峰县达标名校2024届中考数学适应性模拟试题含解析.doc
- 湖北省枣阳阳光校2024届中考数学最后冲刺浓缩精华卷含解析.doc
- 湖北省武汉市七一华源中学2024年中考联考数学试题含解析.doc
- 湖北省武汉市武昌区南湖中学2024年毕业升学考试模拟卷数学卷含解析.doc
- 湖北省武汉市青山区5月2024年中考数学模拟预测题含解析.doc
- 湖北省孝感市应城市重点名校2024届中考数学最后冲刺浓缩精华卷含解析.doc
- 湖北省孝感市孝南区肖港镇肖港初级中学2023-2024学年中考数学猜题卷含解析.doc
- 湖北省枣阳市钱岗中学2023-2024学年中考试题猜想数学试卷含解析.doc
- 湖南省衡阳市蒸湘区2024年中考考前最后一卷数学试卷含解析.doc
- 湖北省重点中学2023-2024学年中考数学最后一模试卷含解析.doc
最近下载
- 音响灯光系统维保方案.docx VIP
- 第五章——陶瓷基复合材料.ppt VIP
- xxxxxxxxxxx工程创“钱江杯”优质工程情况汇报.docx VIP
- 西华大学电气与电子信息学院课程设计—某农村电网110kV变电所继电保护的配置和整定(3).docx
- xx工程创“钱江杯”优质工程情况汇报.doc
- EN 50124-1-2001铁路设施 — 绝缘配合 — 第 1 部分:基本要求 — 所有电气和电子设备的间隙距离和爬电距离(中文版).doc
- 中国古代的法治与教化 教学设计-【新教材】高中历史统编版(2019)选择性必修1.docx
- (高清版)B-T 3836.1-2021 爆炸性环境 第1部分:设备 通用要求.pdf VIP
- 2022《立体仓库控制系统设计》开题报告.doc VIP
- 2024年银行支部书记党课讲稿集合6篇.docx VIP
文档评论(0)