- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
改施用水电施工方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 拓展练:高级企业培训师教材.doc
- 招投与合同管理教案.doc
- 拍摄作餐饮广告片解析餐饮文化的境界.docx
- 招投管理细则.doc
- 招商行组织结构.doc
- 招标动管理办法.doc
- 投资界盈利模式与营收项目前景分析.docx
- 招标师《招标采购法律法规与政策》模拟试卷中大网校.doc
- 招投最新办法.doc
- 招标标制度三十.doc
- 果乳行业市场深度分析及发展策略研究报告2024-2029版.docx
- 2024至2030年中国光热产业深度调研及投资战略分析报告.docx
- 中国显示器电源行业市场现状分析及竞争格局与投资发展研究报告.docx
- 2024至2030年中国电力线载波通信(PLC)行业市场运行及投资策略咨询报告.docx
- 2024至2030年中国模具行业市场运行及投资策略咨询报告.docx
- 2024至2030年中国大蒜产业深度调研报告.docx
- 中国高亮发光二极管行业市场现状分析及竞争格局与投资发展研究报告2024-2029版.docx
- 新统编人教版语文三年级上册《铺满金色巴掌的水泥道(第1课时)》ppt教学课件.pptx
- 新统编部编版语文二年级上册《我要的是葫芦(第2课时)》教学课件.pptx
- 新统编部编版语文二年级上册《一封信(第1课时)》教学课件.pptx
最近下载
- 音响灯光系统维保方案.docx VIP
- 第五章——陶瓷基复合材料.ppt VIP
- xxxxxxxxxxx工程创“钱江杯”优质工程情况汇报.docx VIP
- 西华大学电气与电子信息学院课程设计—某农村电网110kV变电所继电保护的配置和整定(3).docx
- xx工程创“钱江杯”优质工程情况汇报.doc
- EN 50124-1-2001铁路设施 — 绝缘配合 — 第 1 部分:基本要求 — 所有电气和电子设备的间隙距离和爬电距离(中文版).doc
- 中国古代的法治与教化 教学设计-【新教材】高中历史统编版(2019)选择性必修1.docx
- (高清版)B-T 3836.1-2021 爆炸性环境 第1部分:设备 通用要求.pdf VIP
- 2022《立体仓库控制系统设计》开题报告.doc VIP
- 2024年银行支部书记党课讲稿集合6篇.docx VIP
文档评论(0)