- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
某科公司现金计划薪酬方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 杭州智慧城市建设总体规划.doc
- 杭州文教育广告策划.doc
- 杭州旅游规划.doc
- 杭州行会计业务印章管理实施细则.doc
- 杭州湖风景区管理模式探究.docx
- 杭市钱江新城规划管理技术规定.doc
- 杯口础钢结构施工工法.docx
- 松维路板深圳有限公司.doc
- 松花流域综合规划.doc
- 杭州球假日旅行社有限公司.doc
- WST 403-2024 临床化学检验常用项目分析质量标准.pdf
- WST 406-2024 临床血液检验常用项目分析质量标准.pdf
- SJG 159-2024 装配式装修评价标准.pdf
- QBT 5896-2023 全自动一次性医用口罩机.pdf
- SJG 160-2024 钢结构装配式住宅技术规程.pdf
- QBT 5877-2023 工业用洗烘一体机.pdf
- QBT 6008-2023 真空制盐厂设计规范.pdf
- WST 409-2024 临床定量检测方法分析总误差的评估.pdf
- WST 415-2024 无室间质量评价时的临床检验质量评价.pdf
- QBT 5883-2023 硬质聚氯乙烯低发泡橱柜、卫浴柜板.pdf
文档评论(0)