- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
长二安全教育课件安全培训讲义
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installa
您可能关注的文档
- 钢铁航母”宝钢集团.doc
- 钢铁工业协会理事会议发言稿.doc
- 钢结重型工业厂房二节柱现场空中对接工艺.doc
- 钳工目指导任务书.doc
- 钳工位危险有害因素辨识卡.doc
- 钱清中学学校财产管理制度.doc
- 钨极性气体保护焊及安全操作.doc
- 钻井司生产运行管理办法.doc
- 钻孔注桩安全专项方案.doc
- 钢材陷及成因培训教材.doc
- 市场监管总局直属事业单位2024年度第二批公开招聘笔试模拟试题及完整答案详解1套.docx
- 2025年天津市化工建筑安装工程质量监督站事业单位招聘方案笔试模拟试题带答案详解.docx
- 2025上半年四川省第九地质大队招聘26人笔试模拟试题及答案详解1套.docx
- 2025年浙江湖州长兴县事业单位招聘39人笔试模拟试题含答案详解.docx
- 2025年浙江舟山市银龄医师招募6人笔试模拟试题附答案详解.docx
- 浙江宁波北仑区图书馆编外用工招聘5人(2024年第七批)笔试模拟试题及参考答案详解.docx
- 2024年湘潭市市直公立医院公开引进总会计师笔试模拟试题及参考答案详解1套.docx
- 2025年 陇南市康县豆坝镇司法协理员招聘考试笔试试卷[附答案].docx
- 2025年山东潍坊市市直事业单位招聘初级综合类岗位人员87人笔试模拟试题及参考答案详解1套.docx
- 2025年甘肃庆阳市镇原县事业单位引进人才40人笔试模拟试题及答案详解1套.docx
文档评论(0)