沉降观测施工的方案.docxVIP

  • 25
  • 0
  • 约7.44千字
  • 约 12页
  • 2017-04-23 发布于北京
  • 举报
沉降观测施工的方案

目 录 工程概况··········································1 编制依据··········································9 观测等级确定······································9 仪器设备及人员配备································9 网的建立及高程系统································9 沉降观测点的布设与埋设····························9 观测··············································10 补充说明··········································10 内页计算及成果整理································10 提交资料··········································10 十一、附图··············································11 工程概况 1.工程总介绍 序号项 目内 容1工程名称盛和.日月华庭--1号楼、2号楼、3号楼、4号楼、地下车库及服务用房2地理位置河北省张家口市沈家屯村东南部,清水河西路以西、张家口市第一中学新校区南侧,朝阳西大街南侧、西苑南路东侧3建设单位张家口国能房地产开发有限公司4设计单位北京正华建筑设计事务所5勘察单位张家口市京北岩土工程有限公司6监督单位张家口质量监督站7监理单位张家口正元工程管理有限公司8施工总承包单位中扶建设有限责任公司9合同承包范围施工图纸范围内的土建、电气、给排水、采暖、通风、弱电(只作预埋),发包方分包、指定的项目除外10合同性质包工包料11投资性质自筹资金12合同工期639日历天,2012.4.01~2013.12.3113合同质量目标合格2.结构设计简介 表2-3 序号项 目内    容1结构选型地基基础:1号楼、2号楼、3号楼、4号楼为现浇钢筋混凝土筏形基础,地下车库及服务用房为柱下独立基础+筏板基础抗侧力体系:1号楼、2号楼、3号楼、4号楼为现浇钢筋混凝土剪力墙结构,地下车库及服务用房为现浇钢筋混凝土框架结构楼盖结构:现浇钢筋混凝土普通梁板2土质情况1号楼、2号楼、3号楼、4号楼 第1层:素填土,厚度0.40~6.50m。 第2层:粉土,厚度2.40~9.00m;细砂,揭露最厚3.50;砾砂,揭露最厚3.10。 第3层:园砾,厚度0.40~3.30m。 第4层:卵石、揭露最厚29.00m,粉土、最厚2.5m。地下车库及服务用房 第1层:杂填土,未经压实,厚度0.40~6.50m。 第2层:粉土,具有湿陷性,厚度0.50~9.00m。 第3层:园砾,级配较好局部缺失,厚度0.5~3.20m。 第4层:卵石,级配较好,揭露最深16.7m;粉土,不具有湿陷性,最厚2.5m。3地下水 地下水位埋深在地表下50.00m左右(相应于绝对标高约660.0m),历史最高地下水位埋深45m左右(相应于绝对标高约665.0m),近三~五年最高水位埋深48m左右(相应于绝对标高约662.0m),且地下水位呈逐年下降趋势。 本场区地下土对钢筋混凝土和钢筋混凝土中的钢筋具微腐蚀性4地基1号楼、3号楼: 采用CFG桩复合地基,主楼地基承载力特征值为290kpa、压缩模量不小于Es=25.0Mpa,裙房的地基承载力特征值为200kPa、压缩模量不小于Es=20.0Mpa。 复合地基处理后应消除桩间土湿陷性。 基础最终沉降量不大于40mm,地基处理后地基变形倾斜值小于0.005L。 复合地基的处理范围:主楼筏板宽出2000mm,复合地基的处理深度8m,至第二个4层卵石顶面。2号楼、4号楼: 采用换垫层地基,要求将第4层以上土全部清除,用级配砂石换填,分层夯实,每300一层,压实系数0.97,地基承载力特征值为250kpa、压缩模量不小于Es=30.0Mpa。 基础底面以下换填级配砂石范围:顶面为筏板宽出300mm,底面为筏板宽出≥1000mm。地下车库及服务用房: 采用人工复合地基,采用夯扩挤密灰土桩对第2层粉土进行处理,处理至第3层圆砾或第4层卵石顶面。 地基承载力特征值为200kPa,压缩模量不

文档评论(0)

1亿VIP精品文档

相关文档