冶金机械专业英语Unit111.doc

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
冶金机械专业英语Unit111

Contents Unit 1 Introducing to Working Drawings Unit 2 The computer in Design and Graphics Unit 3 Lathes Unit 4 Lubrication Unit 5 From the History Ironmaking and Steelmaking Unit 6 Raw Materials for the Production of Iron Unit 7 The Blast Furnace Plant Unit 8 Raw Materials of Steeling Unit 9 LD Practice Unit10 Continuous Casting of Steel Unit11 Rolling Unit 1 Introducing to Working Drawings Working drawings are the drawings from which a design is implemented. All principles of orthographic projection and techniques of graphics can be used to communicate the details of a project in working drawings. A detail drawing is a working drawing of a single part (or detail) within the ser of working drawings. Specifications are the written instructions that accompany working drawings. When the design can be represented on a few sheets, the specifications are usually written on the drawings to consolidate the information into a single format. All parts must interact. with other parts to some degree to yield the desired function from a design. Before detail drawings of individual parts are made the designer must thoroughly analyze the working drawing to ensure that the parts fit property with mating parts, that the correct tolerances are applied, that the contact surfaces are properly finished, and that the proper motion is possible between the parts. Much of the work in preparing working drawings is done by the drafter, but the designer, who is usually an engineer, is responsible for their correctness. It is working drawings that bring products and systems into being. Working drawings are legal contracts that document the design details and specifications as directed by the engineer. Therefore drawings must be as clear, precise, and thorough as possible. Revisions and modifications of a project at the time of production or construction are much more expensive than when done in the preliminary design stages. Poorly executed working dr

文档评论(0)

haihang2017 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档