- 1、本文档共18页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
冶金机械专业英语Unit111
Contents
Unit 1 Introducing to Working Drawings
Unit 2 The computer in Design and Graphics
Unit 3 Lathes
Unit 4 Lubrication
Unit 5 From the History Ironmaking and Steelmaking
Unit 6 Raw Materials for the Production of Iron
Unit 7 The Blast Furnace Plant
Unit 8 Raw Materials of Steeling
Unit 9 LD Practice
Unit10 Continuous Casting of Steel
Unit11 Rolling
Unit 1 Introducing to Working Drawings
Working drawings are the drawings from which a design is implemented. All principles of orthographic projection and techniques of graphics can be used to communicate the details of a project in working drawings. A detail drawing is a working drawing of a single part (or detail) within the ser of working drawings.
Specifications are the written instructions that accompany working drawings. When the design can be represented on a few sheets, the specifications are usually written on the drawings to consolidate the information into a single format.
All parts must interact. with other parts to some degree to yield the desired function from a design. Before detail drawings of individual parts are made the designer must thoroughly analyze the working drawing to ensure that the parts fit property with mating parts, that the correct tolerances are applied, that the contact surfaces are properly finished, and that the proper motion is possible between the parts.
Much of the work in preparing working drawings is done by the drafter, but the designer, who is usually an engineer, is responsible for their correctness. It is working drawings that bring products and systems into being.
Working drawings are legal contracts that document the design details and specifications as directed by the engineer. Therefore drawings must be as clear, precise, and thorough as possible. Revisions and modifications of a project at the time of production or construction are much more expensive than when done in the preliminary design stages.
Poorly executed working dr
您可能关注的文档
最近下载
- 党员先锋队创建实施方案范文(精选6篇).docx VIP
- 《jjg692-1999-数字式电子血压计(静态)检定规程》.pdf
- 万维生物核心知识点.pdf
- GB 44263-2024 电动汽车传导充电系统安全要求.pdf
- 2024年考研中医综合真题及答案.doc
- 多层隔热组件接地装置.pdf VIP
- 中英对照 USP美国药典 1504 化学合成法多肽原料药起始物料的质量属性0109.docx
- 工程招标文件课件.pptx
- 中职英语(高教版)基础模块一Unit4 School Life Warming up优质教学课件PPT.pptx VIP
- 24DX002-1建筑电气与智能化通用规范图示.pdf VIP
文档评论(0)