- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
roydong四季养生知识及食谱大全春季养生食谱春
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- CA机床纵向进给单元的数控化改造.doc
- C涟源人民东路店主店庆促销活动方案改.doc
- CALTS第七届中国服装行业供应链与物流技术研讨会.doc
- C认证内审检查表范例.doc
- C认证实际上是英文名称.doc
- CT超市联盟运行模式概况.doc
- D打印即RP介绍.doc
- CO气体保护自动焊接小车作业指南AWJB.doc
- DGT C发电机变压器保护装置成套保护装置操作指导书发电机.doc
- DDS基于AD的波形发生器设计.doc
- 急性肾功能衰竭综合征的肾血管介入性诊治4例报告并文献复习.docx
- 基于血流动力学、镇痛效果分析右美托咪定用于老年患者髋部骨折术的效果.docx
- 价格打骨折 小心统筹车险.docx
- 交通伤导致骨盆骨折合并多发损伤患者一体化救治体系的效果研究.docx
- 多层螺旋CT与DR片诊断肋骨骨折的临床分析.docx
- 儿童肱骨髁上骨折后尺神经损伤恢复的预测因素分析.docx
- 康复联合舒适护理在手骨折患者中的应用及对其依从性的影响.docx
- 机器人辅助老年股骨粗隆间骨折内固定术后康复.docx
- 超声辅助定位在老年髋部骨折患者椎管内麻醉中的应用:前瞻性随机对照研究.docx
- 两岸《经济日报》全面合作拉开帷幕.docx
原创力文档


文档评论(0)