- 1、本文档共107页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 合成氨项节能技术.doc
- 合肥市中兴西湖花园三期商铺营销推广总案.doc
- 合肥亩别墅项目的方案页.doc
- 合理选用感冒药.doc
- 合肥神鹿物料编码原则.doc
- 吉林大学 农学部硕士研究生专业目录.doc
- 吉林大学与山东省滨州畜牧兽医研究院.doc
- 吉林公务员申论写作:人民日报常用语【终结篇】.doc
- 合肥师范学院大学生暑期社会实践活动实施方案.doc
- 同声传译系统的设计.doc
- 埃森哲Accenture云连续体重塑高科技企业英文版31页.pdf
- 埃森哲2024超越维持运转基础设施管理激发创新-基础设施托管服务在促进业务重塑中的作用研究报告英文版25页.pdf
- ODA安永2023年海洋商业领袖峰会白皮书英文版64页.pdf
- 益普索2024人类与AI在广告创意中的作用与效果对比研究报告-AI创意的局限性与人类创造力的重要性英文版23页.pdf
- OMFIF安永区块链在公共财政中的应用英文版13页.pdf
- 安永EY2022年印度交通电气化报告-加快电动交通的步伐英文版102页.pdf
- 埃森哲2024成式AI时代的供应链转型报告-化潜能为实效英文版33页.pdf
- 安永KLAS2023付款人技术研究报告英文版21页.pdf
- 凯捷2024年自智网络研究报告-电信业为何及如何加速其自智网络之旅英文版80页.pdf
- 安永-李颖-加速数字化智能马BDM数字化成熟度评估模型2.0实践.pdf
文档评论(0)