- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
酒店节能减排条
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 赵海人口城镇化的现实困境与路径选择.doc
- 走出家庭教育的误区新.doc
- 起航新春联谊会节目串词.doc
- 超市连锁互联网便利店超市电子商务商业模式DOC 页.docx
- 超实用家装手册四装修.doc
- 超市完整资料.doc
- 超市商场历春节策划方案.doc
- 走上街头拍城市 招城市风光摄影技巧.doc
- 超详细的CFA一级复习心得.docx
- 身材健康气色.doc
- 以雨为话题的想象作文(8篇).docx
- 2025年跨境电商物流与供应链风险管理研究报告.docx
- 2025年新能源汽车二手车市场评估方法与流通路径优化案例分析报告.docx
- 基于区块链的2025年跨境金融跨境支付结算效率研究.docx
- 数字人民币试点在网络安全产业的产业变革与产业转型报告.docx
- 基于区块链的2025年跨境金融跨境支付清算合规性评估与风险控制策略研究报告.docx
- 2025年太阳能海水淡化技术在沿海地区的推广应用研究报告.docx
- 2025年消费与零售行业可持续发展报告:绿色消费与环保策略.docx
- 银发旅游市场2025年产品创新与旅游市场风险研究报告.docx
- 模具制造数字化设计与仿真2025年技术应用与产业竞争力提升报告.docx
文档评论(0)