- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
策划旅游案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 16
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- 第一节 国消防简介.doc
- 第一批,家重大自然灾害应急无人机监测站合作协议签署暨授牌仪式.doc
- 第一视角第三视角的区别.doc
- 第一节 家与地区分析.doc
- 第一性原计算.doc
- 第一部分业人才培养方案.doc
- 第一部分祖起源.doc
- 第一讲三五帝夏商周.doc
- 第一讲 地产经纪行业剖析.doc
- 第一组 蔬超市.doc
- 年三年级数学下册第三四单元过关检测卷新人教版.docx
- 第十三章轴对称(复习课)1.ppt
- 15.1.2分式基本性质(2).ppt
- 期末冲刺(补全对话30道).docx
- 【华创证券-2025研报】2025年二季报公募基金十大重仓股持仓分析.pdf
- 【港交所-2025研报】景福集团 截至2025年3月31日止年度年报.pdf
- 【天风证券-2025研报】2025中报前瞻:关注预告日至财报日的景气超额.pdf
- 【国金证券-2025研报】连连数字(02598):跨境支付先行者,前瞻布局虚拟资产.pdf
- 【第一上海证券-2025研报】云工场(02512):云工(02512):IDC方案服务商,边缘云业务打造第二成长曲线.pdf
- 【东方证券-2025研报】主动权益基金2025年二季报全解析:重点关注科技医药双主线和中小盘高成长主题基金.pdf
文档评论(0)