- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
行测公共础知识总结
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installatio
您可能关注的文档
- 营销组合完善与创新.doc
- 营销学原随堂作业及答案.docx
- 薄片零件压机.docx
- 薪资设计过程中牵涉相当多的因素.doc
- 薪资外部配方法.docx
- 薪酬体系计基本程序.doc
- 薪酬概论点知识.doc
- 薪酬福利系设计方案.doc
- 藤野先生段分析.doc
- 蓟县西井村入选中国传统村落 探访古村现状.doc
- 2025年一年级语文下册 小小观察家乐园综合测试卷(可编辑).docx
- 2022年黑龙江省大庆市中考道德与法治真题(原卷版).pdf
- 2022年河南省中考语文真题(原卷版).pdf
- 清洁能源:火力发电新篇章-探索高效清洁能源的火力发电技术.pptx
- 2022年黑龙江省龙东地区中考英语真题(解析版).pdf
- 2025年五年级语文下册 科学精神探索号综合测试卷(可编辑).docx
- 2022年黑龙江大庆中考历史真题(解析版).pdf
- 电子游戏发展历程-一位游戏史研究专家的视角.pptx
- 2022年河南省中考物理试题(解析版).pdf
- 2025年五年级语文下册 信息世界辨真伪综合测试卷(可编辑).docx
文档评论(0)