- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
计算机网实验实验四
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 视得安楼对讲解决方案.doc
- 解馋坊特小吃店计划书.doc
- 视频图文解乐城第二代“未来超市”.doc
- 计 量 理 体 系 文 件.doc
- 解读行心疗云.doc
- 计算机二办公软件自动化.doc
- 计算机专大专毕业论文.doc
- 计 算 导 论基础知识.docx
- 计算机基理论知识.doc
- 计算机学红十字会暑期社会实践赴清远连山实践活动策划.doc
- 前瞻性分析:2025年药品原辅料供应链稳定化与风险预警策略.docx
- 乡村民宿特色美食开发与推广策略研究报告.docx
- 新兴产业投资银行融资中的政策支持与市场分析报告.docx
- 全球生物医药领域2025年产业链上下游协同发展报告.docx
- 2025年智能电网分布式储能系统在新能源消纳中的应用与调度策略研究报告.docx
- 2025年城市公园改造项目社会稳定风险评估与公众满意度调查报告.docx
- 低空经济2025无人机物流环境风险评估与风险防控体系构建报告.docx
- 氢燃料电池汽车商业化模式2025年产业链风险与挑战研究报告.docx
- 2025年跨境电商物流协同管理策略——跨境电商物流与跨境电商物流金融融合发展.docx
- 2025年航空航天产业航空发动机燃油效率提升策略.docx
文档评论(0)