- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
详解凯迪克SRX号公路纪念版
新 闻 稿
供即时发布
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking i
您可能关注的文档
- 计算机应技术毕业设计论文.doc
- 论大型医设备营销.doc
- 论外汇期交易.doc
- 论学生创性思维的培养.docx
- 论对农村用社的监管防范和化解经营风险.doc
- 论契约在政法中的引入一.doc
- 论我国保业的发展.doc
- 论对消费法律权益的保护.doc
- 论我国旅开发中古建筑保护的现状及对策.doc
- 论文 河文化.doc
- 2025年城市共享自习室连锁化市场细分与竞争格局分析.docx
- 2025年智能穿戴设备用户对血压监测功能评价报告.docx
- 2025年新型老年康养服务体系建设可行性研究及实施路径报告.docx
- 2025年精神病学测试题目及答案.doc
- 2025年超市连锁单店盈利优化与消费者行为分析.docx
- 2030年VR游戏产业内容生态创新趋势分析报告.docx
- 2025年师资共享在职业培训中的师资队伍建设路径报告.docx
- 金融企业2025风险防控体系建设策略规划报告.docx
- 植物基食品行业消费者行为研究报告:2025年需求分析与市场预测.docx
- 生鲜电商2025年冷冻食品损耗率降低方案报告.docx
文档评论(0)