- 1、本文档共48页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 通讯运维IS解决方案.doc
- 道口标准建设.doc
- 道德品质公民素养评价标准及说明.doc
- 造价员土卷及答案.doc
- 通用汽车板支撑架修边冲孔模具设计.doc
- 道德的内实践与理性认知孔子和苏格拉底道德教育比较.doc
- 通天星定终端说明书.doc
- 遗学遗传教学大纲.doc
- 送风系统定性.doc
- 遴选写作例分析.doc
- 中成药的合理应用.pptx
- PICC导管相关性血栓形成及处理.pptx
- 夏秋猪病多高烧辨证施治错不了.ppt
- 某地产公司项目沟通报告.ppt
- 员工关系管理与劳动法规操作实务(正式).pptx
- 2025年中级注册安全工程师之安全生产法及相关法律知识考试题库及答案(必刷).docx
- 2025年云南省西双版纳傣族自治州选调生考试(行政职业能力测验)综合能力测试题完整.docx
- 2025年注册消防工程师之消防安全技术实务考试卷精选答案.docx
- 2025年云南省保山地区行政职业能力测验模拟试题审定版.docx
- 2025年云南省香格里拉市事业单位考试职业能力倾向测验(中小学教师类D类)强化训练题库汇编.docx
文档评论(0)