- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
金色阳光目书
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 14
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 采购作业导书.doc
- 采购人员质要求.doc
- 酸碱平衡酸碱滴定法教案.doc
- 采购合同订要求.doc
- 采购员应备的素质.doc
- 采购部经助理.doc
- 采购经理质要求.doc
- 醋泡鸡蛋做法及功效.doc
- 重大产业展及重大公益民生类项目申报指南.docx
- 酒店防盗警系统.doc
- 2025年中国楼宇门数据监测报告.docx
- 2025年综合类-中级房地产经济-第十二章房地产开发项目前期策划历年真题摘选带答案(5卷100道合辑.docx
- 2025年中国90°外螺纹弯头行业投资前景及策略咨询研究报告.docx
- 2025年中国卷边筒数据监测报告.docx
- 2025至2030年超细银包铜粉项目可行性研究报告.docx
- 2025年中国单路VGA双绞线音视频发送器行业投资前景及策略咨询研究报告.docx
- 2025年中国打印标签铜版纸行业投资前景及策略咨询研究报告.docx
- 2025年中国拼装式小箱行业投资前景及策略咨询研究报告.docx
- 中国船舶复合材料行业发展分析及投资风险预测分析报告2025-2028版.docx
- 2025年中国防水纸箱数据监测报告.docx
文档评论(0)