- 1、本文档共21页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
合肥工业大学制冷工程大学毕业论文
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should bePAGE 20
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casin
您可能关注的文档
- 全国硕士研究生入学考试英语核心词汇必备商志词汇增加单元对应信息复制.doc
- 全国经济专业技术资格考试经济基础.doc
- 全国会计专业考试经济法基础密押试卷一.docx
- 全国经济专业技术资格考试试卷人力资源管理专业知识与实务初级.doc
- 全国经济专业技术资格考试试卷经济基础.doc
- 全国经济专业技术资格考试试卷经济基础中级.doc
- 信息系统项目管理师计算分析题ME.doc
- 全国经济专业技术资格考试试卷金融专业知识与实务初级.doc
- 全国经济专业技术资格考试试卷建筑经济专业知识与实务中级.doc
- 全国经济专业技术资格考试试卷金融经济专业知识与实务中级.doc
- 2025年江苏苏州太仓市教育系统招聘教师130人笔试高频难、易错点备考题库及参考答案详解一套.docx
- 2025年江苏省地震局招聘事业单位工作人员笔试高频难、易错点备考题库及答案详解一套.docx
- 2024年果洛州公务员考试行测试卷历年真题精选答案详解.docx
- 2024年揭阳市公务员考试行测试卷历年真题精编答案详解.docx
- 2024年巴音郭楞蒙古自治州公务员考试行测试卷历年真题及答案详解(必刷).docx
- 2024年张家界市公务员考试行测试卷历年真题及完整答案详解一套.docx
- 2024年昭通市公务员考试行测试卷历年真题带答案详解.docx
- 2024年广东省公务员考试行测试卷历年真题及答案详解(新).docx
- 2024年德州市公务员考试行测试卷历年真题附答案详解(实用).docx
- 2024年景德镇市公务员考试行测真题附答案详解(突破训练).docx
文档评论(0)