- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
福建高职招考信息技术知识点模拟题及答案:信息获取
考单招——上高职单招网
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casi
您可能关注的文档
- 曼昆经济学原理宏观经济学分册第版笔记第章生产与增长.doc
- 曼昆经济学原理宏观经济学分册第版课后习题详解第章宏观经济政策的六个争论问题.doc
- 曼昆经济学原理微观经济学分册第版笔记第章收入不平等与贫困.doc
- 曼昆经济学原理微观经济学分册第版核心讲义第章应用:国际贸易.doc
- 曼昆经济学原理微观经济学分册第版笔记第章应用:国际贸易.doc
- 最新cssci经济管理类核心期刊目录.doc
- 最新中级经济法第六章题.doc
- 曼昆经济学原理微观经济学分册第版课后习题详解第章收入与歧视.doc
- 曼昆经济学原理微观经济学分册第版课后习题详解第章微观经济学前沿.doc
- 批发市场价格上报系统信息员操作手册v.doc
最近下载
- 电力隧道电力隧道工程c标段施工方案.doc VIP
- 九年级物理第21章《信息的传递》全章课件.ppt VIP
- Unit 4 Fun with numbers(Get ready)外研版(三起)(2024)英语三年级上册.pptx VIP
- (妇产科)子宫内膜癌教学查房.pptx
- 供应商审核报告范文模板.docx VIP
- 机场行测考试题库.pdf VIP
- 2025年《网络设备配置与安全》课程标准.docx VIP
- 成都市盐道街中学高一入学语文分班考试真题含答案.docx VIP
- 成都市盐道街外国语2025高一入学英语分班考试真题含答案.docx VIP
- 成都市盐道街外国语2025高一入学数学分班考试真题含答案.docx VIP
文档评论(0)