- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
我国房地产市场形势分析与展望
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. shaft coupling .1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the
您可能关注的文档
- 上半旅游市场监测报告.doc
- 上半苏州住宅市场调查报告.doc
- marketingandbdparticipantnotes市场营销与业务拓展培训手册.doc
- 上海车展凸显市场新增长点和竞争势力.doc
- 中原地区房地产市场特性分析doc.doc
- 中信现金优势货币市场基金第季度报告.doc
- 东财市场营销学在线作业一.docx
- 中国乘用车潜在消费者市场需求存区域化差异.docx
- 中国市场发展报告.doc
- 中国旅游地产市场预测与战略咨询报告.doc
- 智能物流园区规划与设计:自动驾驶技术在物流园区中的应用与前景教学研究课题报告.docx
- 基于生成式AI的小学科学与数学跨学科教学融合探索教学研究课题报告.docx
- 小学信息技术教学中生成式AI辅助教师反思的实践探索与效果评估教学研究课题报告.docx
- 基于工业互联网平台的制造企业智能制造系统优化研究教学研究课题报告.docx
- 国家智慧教育云平台在农村学校教育信息化建设中的应用效果评估教学研究课题报告.docx
- 6 《职业院校双师型教师队伍建设教学评价与反馈研究》教学研究课题报告.docx
- 基于翻转课堂的初中语文比较阅读教学效果评价与优化策略教学研究课题报告.docx
- 保鲜膜对苹果保鲜效果及微生物生长影响的研究报告教学研究课题报告.docx
- 孩子们的学期之旅.pptx
- 小学至高中AI个性化学习支持服务成本效益的评估体系构建与应用教学研究课题报告.docx
文档评论(0)