Q/CDT 201 0002—2009 Q/CDT 201 0002—2009 or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications.