闸坝群常规防污调度方法分析.docVIP

  • 5
  • 0
  • 约1万字
  • 约 5页
  • 2017-05-09 发布于上海
  • 举报
闸坝群常规防污调度方法分析

Journal of Water Resources Research 水资源研究, 2012, 1, 284-288 /10.12677/jwrr.2012.14042 Published Online August 2012 (/journal/jwrr.html) Analysis of Conventional Antifouling Scheduling Method for Slice Gate Group* Meifeng Zhong, Shichun Gao, Huiyun Zhang State Key Laboratory of the Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan Email: meifengzhong@ Received: Apr. 14 , 2012; revised: May 21 , 2012; accepted: May 29 , 2012 th st th Abstrac

文档评论(0)

1亿VIP精品文档

相关文档