- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
下半江苏苏州吴中区事业单位考试复习资料
2014下半年江苏苏州吴中区事业单位考试资料
华图网校:
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. shaft coupling .1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral rais
您可能关注的文档
最近下载
- 护理事业近五年发展规划(2026-2030).pdf VIP
- 虚体医学丛书:医说解集——昆明新空间1025实验室.pdf VIP
- 跨学科实践活动10 调查我国航天科技领域中新型材料、新型能源的应用-九年级化学下册(人教版2024).pptx VIP
- 2024中国可再生能源大会:大型伞梯式陆基高空风力发电技术研究.docx
- 特发性与继发性三叉神经痛诊疗专家共识(2025版).pptx VIP
- 工艺管道施工方案.pdf VIP
- 《像山那样思考》课件.ppt VIP
- 工艺管道施工方案.doc VIP
- 分析石油地质勘探与储层评价方法.docx VIP
- DB11T 891-2012 居住建筑节能设计标准.pdf VIP
文档评论(0)