并购战略与重组实务许志勇中华讲师网.docx

并购战略与重组实务许志勇中华讲师网

position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the ma

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档