- 1、本文档共35页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
东师春季现代教育技术在线作业答案
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 《行政决策学》在线作业分.doc
- 《就业协议书》的重要性及毕业生注意事项新.doc
- 《进出口报关实务》电子教案保税物流货物保税仓库.doc
- 《诺特瑞公证业务集成系统软件公证软件》简介.doc
- 《预包装食品营养标签通则》GB问答.doc
- 《食品营养强化剂使用标准》GB问答.doc
- 《马克思主义基本原理》题库二多选.doc
- 《电子技术基础》教案刘重.doc
- 一小全省科研会材料修订稿.doc
- 『摄影技巧』SteveMcCurry:选图的艺术.doc
- 2010-2023历年福建省宁化县七年级下学期期末考试历史试卷(带解析).docx
- 2010-2023历年福建省南安一中高二下学期期中考试化学试卷(带解析).docx
- 2010-2023历年福建省福州八中高二下学期期末考试地理试卷(带解析).docx
- 2010-2023历年福建省南安一中高二下学期期末考试化学试卷.docx
- 2010-2023历年福建省三明九中高二上学期第二次月考英语试卷(带解析).docx
- 2024年中国CO2激光高速切割打标机市场调查研究报告.docx
- 2024年中国方形不锈钢拼装水箱市场调查研究报告.docx
- 2010-2023历年福建省晋江市永和中学九年级上学期期中考试政治试卷(带解析).docx
- 2010-2023历年福建省泉州一中七年级上学期期中考试生物试卷(带解析).docx
- 2010-2023历年福建省清流一中高三上学期第一阶段测试政治试卷(带解析).docx
文档评论(0)