INSPECTIONPENRICEANGASTONQUARRYOPERATION澳大利亚安格斯顿采石操作检查.pptVIP

INSPECTIONPENRICEANGASTONQUARRYOPERATION澳大利亚安格斯顿采石操作检查.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
INSPECTIONPENRICEANGASTONQUARRYOPERATION澳大利亚安格斯顿采石操作检查

INSPECTION PENRICE ANGASTON QUARRY OPERATION Thursday 19 February 2009 MPL 118 Determine compliance against the applicable obligations as set out in the Mining Act 1971, the lease conditions and approved mining and rehabilitation program, number 2008/026. “The Licencee must in constructing and operating the Licence, ensure that there are no public nuisance impacts from noise emanating from the Licence. “ Noise levels from onsite sources are below the SA EPA Environmental Protection (Noise) Policy 2007. Use of heavy mine vehicles and equipment only between the hours from 7am to 5.30pm, Monday to Friday and 9am to 1pm Saturdays. (non public holidays) no nuisance impacts to local residents and adjacent land uses from air emissions and dust generated by mining operations Within 3 months of licence commencement a suitable qualified consultant will develop a nuisance dust sampling program Dust analysis not more than the National health Standard “..responsible for recording and addressing complaints received from the public with respect to the mining operations “. Penrice are now entering all complaints on a register and this information is being presented at the PCCG. One of the complaints alleges that considerable noise was generated from a road trucks leaving the site at 2.15am on the 8 February 2009. On inspection of the timesheets and the road truck logs it was found that the last truck left the site at 2145 hours on the 7 February 2009. “..ensure that there is no clearance of native vegetation within the riparian zone of the Jaeckeli Creek Compliance with the Native Vegetation Act 1991 A vegetation management plan to be in place within 3 months Management strategy is for no overburden to be placed within a 25m buffer each side of the centre line of Jaeckeli Creek outside the Private Mine. “..ensure that the existing soil quality and quantity is maintained. “ topsoil is being excavated and stockpiled for reuse in advance of the overburden being dumped. * *

文档评论(0)

haihang2017 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档