总体降水方案(英文)[论文设计].docx

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
总体降水方案(英文)[论文设计]

Method Statement forDewatering(M.S.–005–2.0)China Harbour Engineering Co. L.L.C.MS-0052.017/03/2009R.N.RevisionSubmit. DatePrepared ByChecked ByApproved ByGeneral Introduction of ConstructionGeneralReem Island Development Sectors 2 3Shore Protection Works has a total length of more than 6000 meters. The scope of work includes:Block Type WallStructure、Shore Protection WallStructure、Beach Works、Webbed L-Shaped WallStructure(-3.25m、-2.5m)and canal works。The overall construction area isrequired to be divided into 9 sections, see as below:Picture1 GeneralLayout Excavation of each section:As per the above picture, construction area is divided into 9 sections:Section 1:Webbed L-Shaped WallStructure with Channel Bed level of -3.5mGround level is 0.15-3.01m.Channel Bed excavation level is -2.5m; Level of excavation for foundation is -4.75m。Section 2:Webbed L-Shaped WallStructure with Channel Bed level of -3.5mGround level is 2.6-2.9m,preliminary excavation level is 0.22-0.64m。Channel Bedexaction level is-3.25m;foundation excavation level is -4.75m。Section 3: Block structure with Cannel bed level of -3.25mGround level is 2.66-2.99m,preliminary excavation level is 0.05-0.67m。Channel Bed excavation level is -3.25m,foundation excavation level is -4.75m。Section 4:Webbed L-Shaped WallStructure with Channel Bed level of -3.5mGround level is 2.44-2.81m,preliminary excavation level is 0.30-0.87m。Channel Bed excavation level is-3.25m,foundation excavation level is -4.75m。Section 5:Webbed L-Shaped WallStructure with Channel Bed level of -2.5mGround level is 2.45-3.11m,preliminary excavation level is 0.43-0.95m。Channel Bed excavation level is-2.5m,foundation excavation level is -4m。Section 6:Webbed L-Shaped WallStructure with Channel Bed level of -3.5mGround level is 0.15-3.01m,preliminary excavation level is -2.11--2.78m。Channel Bed excavation level is-3.25m,foundation excavation level is -4.75m。Section 7:Webbed L-Shaped WallStructure with Channel Bed level of -4.5mGround level is 0.2

文档评论(0)

haihang2017 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档