生产车间吊装方案1216.doc

  1. 1、本文档共24页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
生产车间吊装方案1216

Kraft Foods Inc.PEMB Structure Works 卡夫食品预制钢结构工程 Date of Issued):20-12-16 Author/Signature:Approver/Signature: 1-29轴 吊装前期要求In the material before entering good site floor protection, owners 15mm wood protection measures taken in the second floor on the ground, but in order not to damage the ground, my company on the board for secondary protection, taken with3MM thickness of the rubber sheet laying, 堆场位置原则以满足施工要求不影响其它工序施工及工厂正常生产,每一单位堆场平面尺寸为30*米,距离厂房边轴线或沿临时道路路沿平行堆放;使用期限为该品种物料全部应用于所属结构完工止。The area for piling shall be not affect the construction and production, the square is 30*7.5 m. pile along the axis of the plant or the temporary road. The pile area shall used until the material shall have been used to the construction. 安装现场要有足够的安装操作空间。假若因为邻接的建筑物或其它障碍导致没有足够的安装空间,则业主单位需协调并调整出必要的空间。The space shall be ample for erection work, if the adjacent building or other obstacles block, the owner shall make the necessary adjustment 因流水施工工艺的要求,土建施工回填土时必须保证钢柱、钢梁的正常安装施工。Due to the requirement of the construction craft, when the civil backfill, they shall assure the column and beam which can be erected in the course of nature. 5. 材料的现场堆放 material所有卸货与堆放钢结构材料时应严格按照材料装卸及堆放运输进行操作,并同时满足以下要求:The steel material loading and uploading shall be performed comply with the operation code of material loading and uploading, meanwhile the requirement as follows shall be reach : 卸货必须文明安全操作,确保人员安全及材料无损;Upload obey safety direction, make sure worker safe and material undamaged 所有箱、包、捆及零散构件的编号均应处于可视状态,以方便查找;All the bin, package, bundle and any loose members shall marked obviously that any one can see it t 对容易遗失的贵重及零散材料,需要放安全场所并由专人负责保管。For the pile of the valuable and loose material which can be lost easily, in site the designated person shall take care of that. 1-29轴 吊装所需吊车确定 Lifting cranes required to determine 1. Tools and Machinery     TITLE SPEC. QUANTITY 1.21 Crane汽车起重机 90Ton 1 1.22 Crane汽车起重机 12TON 1 其中汽车起重机的安排如下: 用90吨的吊车首先把12吨吊车吊至二楼平台。 Use 90-ton crane 12 ton crane win

文档评论(0)

haihang2017 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档