- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
公路养护工实际测验试题(国外英文资料)
公路养护工理论考试试题(国外英文资料)
Maintenance work level 3
The road route is () on the plane.
A, line B, lower grade C, vertical curve D, line peace curve
The number of lanes on the highway should be at least ().
A, 2 lane B, 4 lane C, 6 lane D, driveway
3, the 3rd level highway is able to adapt to the annual average daily traffic volume of various vehicles ().
A, 15,000 to 30,000 B, 5,000 to 15,000 C, 2,000 ~ 6000 cars D, 1000 ~ 4000 cars
The ratio of high and horizontal distances between two points in the same slope of the line section is called (). A longitudinal grade B slope C slope D flat slope
5, to offset the vehicles on the curve road, generated by the centrifugal force in the cross section of setting the () of the one-way cross-sectional slope, called super A medial above lateral B lateral higher than medial middle C high low D inside and outside the same on both sides
A curve of continuous variation between a straight line and a curve is called ().
A flat curve, B complex curve, C, curve D back
In order to facilitate the driving, the limitation of slope length must be carried out in order to facilitate the driving. The radius of the smaller B is larger and the larger D vertical curve is larger
Higher than the road base called (). A road block B road C, C levees D half A half way
To get the other person to pass through the road on a bicycle, the road surface should be widened at a certain distance, which is a part called (). A overtaking lane B is in the wrong lane
In order to make the upper and lower slopes smooth, a circular curve is inserted between the upper and lower slopes, which is called (). A flat curve B, curve C, curve D
The projection onto the horizontal surface of the highway is called the highway route.
A, B, C, cross section D, longitudinal
When calculating the speed of the vehicle is greater than 60km/h, the minimum linear length between the same direction curve is not less than the speed of the vehicle ().
A, 4, B, 5, C, 6, D, 7
There are two ways in w
您可能关注的文档
- PPT中箭头的绘制(国外英文资料).doc
- PPT快捷键(国外英文资料).doc
- proe中各类文件格局的含义(国外英文资料).doc
- PR快捷键大全(国外英文资料).doc
- proe_格局转换(国外英文资料).doc
- ps裁剪照片照片(国外英文资料).doc
- PS软件心得+门路最终教程+快捷键大全(国外英文资料).doc
- PS图层操纵快捷键(国外英文资料).doc
- PVC性能(国外英文资料).doc
- p系列机械功耗及供电普及常识(国外英文资料).doc
- 六年级科学第二单位(国外英文资料).doc
- 公路水运工程试验检测收集教导《超声波的基础常识》谜底(国外英文资料).doc
- 兰大《土木工程资料》13春在线功课3(国外英文资料).doc
- 公路水运试验检测继承教导 混凝土力学性能检测-自测-谜底(国外英文资料).doc
- 兰大《工程力学(II)(资料)》13春在线功课1(国外英文资料).doc
- 兰大《工程力学》13春在线功课2(国外英文资料).doc
- 兰大《工程力学》13春在线功课3(国外英文资料).doc
- 兰大《工程结构抗震》13春在线功课1(国外英文资料).doc
- 兰大《工程结构抗震》13春在线功课3(国外英文资料).doc
- 兰大《工程结构抗震》13春在线功课4(国外英文资料).doc
文档评论(0)