网站大量收购独家精品文档,联系QQ:2885784924

世冠轮平安策划(国外英文资料).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
世冠轮平安策划(国外英文资料)

世冠轮安全策划 The world crown wheel safety plan Time: March 14, 2011 The serial number Main engineering content hazards Prime precaution Those responsible 1 The engine room oil wastewater recovery fire pollution Prior to the operation, the relevant declaration formalities shall be completed before the work, and the application of the procedure shall be forbidden without the approval of the work. Check whether the pollution prevention measures have been put in place, and whether there is an anomaly in the pipeline connection. Stop all open fire work in the engine room; The task force is assigned to monitor the work process. queenk 2 The rudder blade tear open outfit Lifting harm 1, the construction personnel and the project manager specify the specific tonnage of the equipment, and make a special report on the relevant personnel of the construction project; To inspect the hoisting equipment used in advance, and use a sling that is qualified, reasonable and in accordance with safety requirements; 3, the construction area shall set up a warning area to prevent non-personnel from straying into the area. Designate qualified lifting personnel to conduct special orders and clear command signals; The elevated car is strictly prohibited from overloading. The upper flight must buckle the seat belt, and the foreman will be in the custody. queenk pollution 1, be ready to connect the oil drum, the wooden sky, prevent the hydraulic oil spill in the disassembly project. 3 Open and close the bottom of the ship pollution The project manager and the ship shall make the confirmation and mark accordingly; The workers of the construction team prepare the anti-pollution materials, do the pollution measures well, and the foreman of the construction team is in the field monitoring. Wei-guang he 4 The hull of the ship is cut in zinc Fire explosion Verification of the project manager and the ships party before the operation; Check the position of the box zinc block in the engine room, and the low

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档