- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电梯运行的特性C(国外英文资料)
电梯运行的特性 C++
The ladder is preferred outside the ladder to run the least possible way to respond to the passengers request
Consider the features of several elevator operations:
Status: static waiting, ascending, descending,
2. In the process of upward instruction points four kind of situations: the current position with instructions of up and down two, under the current position of the up and down.
In the descending process, the four conditions of the upward description of the same three.
TDD 4. Has the received multiple instructions, set the priority method (can also be nearby principle, can also be the same priority, can also according to the right of way to calculate the priority: the same power of 0.7 or greater, distance weight difference level/current away from the target direction finally layer level, issue instructions waiting longer priority. According to the results of these for the entire quantity multiplication judgement to the next level.
When youre stationary, you receive multiple user directives, prioritizing the method (you can get close to the first, or the first selection algorithm of the same four)
6. According to a weekly cycle, record every day the number of each level according to the ascending and descending, statistics of each layer of activated degree and the top and bottom lines of possible degree, choose to accept instructions after can be used as priority algorithm
According to the data obtained from 6, you can determine which layer of the elevator should stop at rest to optimize the time for each layer of command response.
8. Your program add can set the preferred method of function changed. You can adjust the algorithm according to the change of situation, to expect the best priority selection algorithm.
The simulation runs very easily. However, when the number of elevators is greater than one, if the algorithm is not good, it will emerge:
1, elevator cluster
2, the elevator running empty
Waiting too long
In particular:
The elevator is i
文档评论(0)