- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
主体结构工程施工方
MAIN STRUCTURE ENGINEERING WORK METHOD1、FORMWORKConsidering the factors that quantity of spares and scale of concrete are too big ,it is better to use plastic plywood and multiple splint as holders and Φ48 steel tube with hook bolts in formwork holding system . 1)、Principle of assembling the plate①keep accuracy of spare shape ,size and location②formwork suppose to have enough intensity, yield and stability , can bear the weight of newly poured concrete and side pressure .etc②Keep the structure simple for being ease to dismantle. ③choose general use and big formwork to make the species and quantity small. ④when formwork are vertically connected ,they supposed to be laid stagger。⑤should design and lay upholding system of formwork according to maximum loads of formwork and intensity of spares 2)、Steps of assembling formwork ①work out quantity of formwork and upholding system which are needed according to construction progress.②design assembling and confirm ways of assembling according to diagram ③arrange upholding system according to designing diagram of upholding.④measure location of pre-buried spares and holes to arrange them accurately .3)、beam boards to support formwork①material to choose:choose 25mm pinewood board as bottom of formwork;choose 18mm multilayer plywood as side formwork,50X70MM pine wood as holding board, bottom formwork choose 18mm thickness plastic plywood ,60x80mm pine wood boards as separating board ,space 300-400mm .②Laying:subsequence of laying: bearing structural formwork constructing-main boards adjustment-inferior bottom formwork adjustment-sides of formwork-side formwork fixing-construct bearing boards-laying cushion boards-seal checking holesAll the project use wooden formwork, width of outside structure beam surface decrease 5mm to inside.All beam which size of beam span more than 4 miters with arc 3-5‰4)、Formwork pillar constructionAssembly formwork molder according to pillar surface and choose the bigger one 5)、Dismantle of formwork ①wh
文档评论(0)