- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
4. 工程量清单报价表(国外英文资料)
4. 工程量清单报价表(国外英文资料)
86
4
Measuring weir
place
3
4-1
The artificial digging groove Top width of 1 m or less depth of 1 m or less Ⅲ type of soil
The m3
17.21
4-2
The width of the bottom of the stone channel of the slurry is 1M
The m3
6.69
4-3
The average thickness of the mortar is 2cm
m2
8.93
4-4
Pre-buried iron installation
t
0.25
4 to 5
The metal face red Dan antirust paint a time
t
0.43
Bidder: (the official seal of the bidder)
Legal representative (or entrusted agent) (signed or sealed)
Date of the year
Bill of quantities
Project name: fujian province state-run GuNong farm consolidation project of big fang reservoir unit: RMB yuan
Serial number
Name of project or expense
unit
quantities
The unit price
And the price
note
(5)
The top of the dam and the upstream and downstream DAMS are cleaned up
one
Such as dam slope formation: artificial readying Ⅲ soils
m2
2558
2
Crest level: artificial readying Ⅳ type of soil
m2
756
3
The roof of the dam is 200mm thick: it is paved with gravel pad and anti-filter layer surface
The m3
151.2
4
The top of the dam is a stone slab of 250mm thick
The m3
189
5
The walls of the wall are torn down: the masonry demolishing the cement slurry
The m3
53.55
6
M7.5 slurry wall: slurry, stone wall
The m3
53.55
7
The M7.5 slurry is lined with stones
The m3
31.5
8
M7.5 mortar block stone drain
The m3
133
9
The masonry dismantled the dry masonry
The m3
32
10
Dry masonry rock protection slope (including gravel bedding, coarse sand cushion, earthwork)
The m3
32
10-1
Dry block stone revetment plane
The m3
32
10-2
Pavement layer of sand and anti-filtration layer
The m3
21.33
10-3
Paving the sand layer, the anti-filter coarse sand cushion layer
The m3
21.33
10-4
Soft soil foundation soil foundation soil
m2
106.67
11
Grassy slope: artificially spread grass, cut down trees, shovel grass, and dig bamboo roots for turf
m2
2267
The second
Second part mechanical, metal construction equipment and installation engineering
(a)
Electrical equipment and installat
文档评论(0)