- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
吊车梁吊装方案(国外英文资料)
吊车梁吊装方案(国外英文资料)
1. The project summary
This scheme is a project for the construction of the crane girder of the steam engine room crane, which is a project of 60 thousand tons/year coal methanol project.
There are 20 parts of the crane beam, 4 models, 1 shaft to 2 axis, 10 shaft to 11 axis ydl9-1b, and the length 9000mm. Axis 2 to 6, 8 to 10 axis, ydl9-1s root is 12, length 9000mm; The 6 axis to the 7 axis, YDL9-1Z root is 2, and the length is 9500mm. 7 axis to 8 axis YDL9-1Z root is 2, length 8450mm. The beam height of crane is 1650mm, the width is 400mm, the top 700mm, the concrete design strength grade is C40. The concrete installation crane has a high table high of 14.69 m. The parameters are as follows:
The serial number
Member number
The number
unit
Single -
For note
one
YDL9-1 b L = 9000 mm
4
t
16.524
2
YDL9-1 s L = 9000 mm
12
t
16.524
3
Z YDL9-1 L = 9500 mm
2
t
17.442
4
Z YDL9-1 L = 8450 mm
2
t
15.514
2. The compilation basis
BREC0702-407-0213-x by the Inner Mongolia boyuan engineering co., LTD.
Construction and acceptance of concrete structures GB50204-2002;
The quality assurance manual and program file of the zhonghua second construction group co., LTD.
Heavy equipment lifting manual - the second edition;
Prepare before the sling
The crane girder is pre-fabricated and the concrete strength meets the lifting conditions. The necessary machinery and construction materials are in place according to the plan.
The required personnel are fully in place as planned and have been certified by safety education.
The plan for the lifting of the installation shall be approved, and the safety and technology shall be completed in accordance with the plan.
3.4 electricity, roads and communications have been improved and unimpeded.
Special operators will be trained and qualified for the certificate.
Inspect the hoisting equipment in full and meet safety requirements.
Around 3.7 remove hoisting working range, the upper and sundry, obstacles, and various kinds of metal materi
您可能关注的文档
- 04年一级建造师建筑工程经济真题及答案(国外英文资料).doc
- 11路面纵、横缝顺直度检查表(国外英文资料).doc
- (建筑工程)第1、3章(国外英文资料).doc
- (判断题)作弊版1(国外英文资料).doc
- 160 知识(国外英文资料).doc
- 16秋北交《公路工程》在线作业1(国外英文资料).doc
- 16秋北交《城市轨道交通牵引电气化概论》在线作业一(国外英文资料).doc
- 16秋北交《施工组织与概预算》在线作业一(国外英文资料).doc
- 16秋北交《施工组织组织设计与概预算B》在线作业一(国外英文资料).doc
- 163531_脚手架计算规则(国外英文资料).doc
- 空压管道施工方案.docx
- 街区自然灾害应急预案范文.docx
- 《农产品冷链物流损耗控制与保鲜技术集成应用的品牌战略威胁分析研究》教学研究课题报告.docx
- 初中语文阅读兴趣培养中的课外阅读与阅读习惯的养成教学研究课题报告.docx
- 人工智能教育伦理准则在初中化学实验课中的应用与反思教学研究课题报告.docx
- 基于人工智能的初中生物教师教学创新与实践研究教学研究课题报告.docx
- 教师数字能力评价数据可视化在初中教学中的应用与创新教学研究课题报告.docx
- 高中物理教学中学生科学探究精神的培养与实践研究教学研究课题报告.docx
- 人工智能在初中语文与地理教学中的跨学科应用研究教学研究课题报告.docx
- 考研作战指挥学题库及答案.doc
文档评论(0)