吊车梁吊装方案(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
吊车梁吊装方案(国外英文资料)

吊车梁吊装方案(国外英文资料) 1. The project summary This scheme is a project for the construction of the crane girder of the steam engine room crane, which is a project of 60 thousand tons/year coal methanol project. There are 20 parts of the crane beam, 4 models, 1 shaft to 2 axis, 10 shaft to 11 axis ydl9-1b, and the length 9000mm. Axis 2 to 6, 8 to 10 axis, ydl9-1s root is 12, length 9000mm; The 6 axis to the 7 axis, YDL9-1Z root is 2, and the length is 9500mm. 7 axis to 8 axis YDL9-1Z root is 2, length 8450mm. The beam height of crane is 1650mm, the width is 400mm, the top 700mm, the concrete design strength grade is C40. The concrete installation crane has a high table high of 14.69 m. The parameters are as follows: The serial number Member number The number unit Single - For note one YDL9-1 b L = 9000 mm 4 t 16.524 2 YDL9-1 s L = 9000 mm 12 t 16.524 3 Z YDL9-1 L = 9500 mm 2 t 17.442 4 Z YDL9-1 L = 8450 mm 2 t 15.514 2. The compilation basis BREC0702-407-0213-x by the Inner Mongolia boyuan engineering co., LTD. Construction and acceptance of concrete structures GB50204-2002; The quality assurance manual and program file of the zhonghua second construction group co., LTD. Heavy equipment lifting manual - the second edition; Prepare before the sling The crane girder is pre-fabricated and the concrete strength meets the lifting conditions. The necessary machinery and construction materials are in place according to the plan. The required personnel are fully in place as planned and have been certified by safety education. The plan for the lifting of the installation shall be approved, and the safety and technology shall be completed in accordance with the plan. 3.4 electricity, roads and communications have been improved and unimpeded. Special operators will be trained and qualified for the certificate. Inspect the hoisting equipment in full and meet safety requirements. Around 3.7 remove hoisting working range, the upper and sundry, obstacles, and various kinds of metal materi

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档