工程竣工模板(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程竣工模板(国外英文资料)

工程竣工模板(国外英文资料) The completion of the project is completed The name of the project: installation, assembly and power station of guiyang project: sa-001 To: guizhou wanda bus co., LTD We have completed the equipment installation and commissioning of the power station in the power station in accordance with the contract. Attachment: Letter of acceptance of the completion of the project 2) the division of engineering and sub-division of projects Catalogue of engineering data and summary table The application form for inspection of the quality of the project Construction unit (chapter) : Item: Date: Review comment: The project is subject to preliminary acceptance Conforming to the current laws and regulations of our country; To meet/fail to meet the current construction standards; Conforming to/not conforming to the design documentation requirements; Meet/fail to meet the requirements of the construction contract. Above all, the preliminary acceptance of the project is qualified/unqualified and can/cannot be formally inspected. Project supervision organization: Chief supervising engineer: Date: Letter of acceptance for the completion of the project The name of the project: installation, assembly and power station of guiyang project: sa-001 To: guizhou wanda bus co., LTD We have been finished according to the contract power station high voltage transformer room equipment installation and debugging, upon passing the self-checking, supervision company and submitted to the acceptance, the project quality conform to the laws, regulations and the mandatory project construction standards, organization staff to your company, please check and acceptance. Contracting unit (chapter) : Item: Date: Construction schedule A stern work Submitted to the Sue Project name: the installation, assembly and power station of guiyang project Construction unit: shaanxi jiangong group equipment installation engineering co., LTD Date: March 22, 2013 The workman reports First, the working procedure

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档