- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程经济作业4(国外英文资料)
工程经济作业4(国外英文资料)
Project 4
One, fill-in-the-blanks:
The program of value engineering is divided into four stages: preparation stage, analysis stage, innovation stage and implementation stage.
The value engineering preparation phase consists of selecting an object, forming a value engineering task force, and developing three steps for the work plan.
The analysis phase of value engineering consists of collecting and sorting information, functional system analysis, and function evaluation 3 steps.
The value engineering innovation phase includes: solution innovation, project evaluation, and compilation of three steps.
The implementation phase of the value project includes: approval, implementation and inspection, and three steps for evaluation.
At present, there are two types of methods used for functional evaluation: the method of absolute value, the method of functional cost. The other class is the relative calculation method, which is the function evaluation coefficient method.
According to the forecast, it can be divided into economic forecast, technical forecast, market demand forecast, etc.
8. Qualitative forecast method is in the lack of data, or things is difficult to quantitatively describe the process of development and change, use of visual materials, relying on personal experience and subjective judgment, and give the estimate method of situation in the future, mainly includes: experts forecast method, del illegal, subjective probability method, etc.
The types of decisions are generally classified according to the nature of the decision: positive, non-positive, and risky.
Second, the choice
The core of a value project is the analysis of the research object (s).
(A) cost (B) quality (C) value (D) function
Life cycle costs are made up of () and cost.
(A) the cost of cost (B) of the cost of production (C) cost of production cost (D)
Life cycle costs consist of ().
(A) cost of cost and function cost (B) construction cost and operational cost (C) production costs
您可能关注的文档
- 1、神经介入颅内动脉瘤临床路径(国外英文资料).doc
- 2002年贵阳市主要河流水质监测站水质评价表(国外英文资料).doc
- 2008水利水电工程管理与实务模拟题(国外英文资料).doc
- 2009年报关员资格考试模拟试题(国外英文资料).doc
- 1鱼塘清淤回填施工技术方案(国外英文资料).doc
- 16秋北交《汽车机械基础(含力学)》在线作业一(国外英文资料).doc
- 2010届高三生物一轮复习必备精品:专题十六(新课标)(国外英文资料).doc
- 2010年北京化学中考试题(国外英文资料).doc
- 18米跨度梯形屋架(国外英文资料).doc
- 2011大学物理竞赛题标准版(含答案)(国外英文资料).doc
最近下载
- 2024年怒江州福贡县义务教育教师专项招聘真题.docx VIP
- 《搭石》第2课时公开课教学课件【部编人教版五年级语文上册】.ppt VIP
- 《海岸工程混凝土结构耐久性技术标准》GBT51464-2024知识培训.pptx VIP
- AQT3034—2022化工过程安全管理导则.pdf VIP
- 巴中市巴州区事业单位考试考试题库2024.docx VIP
- 小学数学新西师版一年级上册全册教案(2024秋).doc
- 2025年秋新教科版三年级上册科学全册精编教案教学设计(新教材).docx
- 《第4单元 花卉盆景技术——水仙盆景的设计与制作课件》初中劳动技术沪科教版七年级课件7216.ppt VIP
- 2025年新教材道德与法治三年级上册第一单元《做学习的主人》教案设计.docx VIP
- 惠普 HP E87640 E87650 E87660 彩色数码复印机中文维修手册.pdf VIP
文档评论(0)