- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
最新公路工程竣工验收办法实施细则2013(国外英文资料)
最新公路工程竣工验收办法实施细则2013(国外英文资料)
The detailed rules for the implementation of the examination and acceptance of the highway project
Approval of the implementation of the documents to be delivered to the highway on March 5, 2008
Highway engineering issued by the part a stern (hand in) the way of detailed rules for the implementation of inspection and acceptance work to further standardize and improve the quality of highway engineering junjun (pay) acceptance and appraisal work, issued by the ministry of transport on recently the highway project junjun (hand in) the way of detailed rules for the implementation of inspection and acceptance work (cross road no. 65 [2010] of the state). The detailed rules shall enter into force as of May 1, 2010, about carrying out the highway engineering junjun notify parties on matters relating to the completion of acceptance of the way (cross road no. 446 [2004] of the state) shall be repealed simultaneously. In the detailed rules, local revision and improvement are made on the inspection and quality identification of highway engineering.
Quality control station
The second O is March 12
Details of the body
The detailed rules for the implementation of the examination and acceptance of the highway project
Chapter I general rule
Article 1 with a view to further standardize and improve the highway engineering junjun (pay) work acceptance, according to the measures for highway engineering junjun (pay) work acceptance (transportation ministry make no. 3, 2004), formulated.
Article 2 the inspection and acceptance of highway projects shall be divided into two phases: the acceptance of the contract and the acceptance of the completion. The main job of the contract is to review the execution of the construction contract and evaluate the quality of the project and make a preliminary evaluation of the work of the participating units. The completion acceptance stage, the main work is: the construction quality, a comprehensive evaluation of the contrac
您可能关注的文档
- 东师《现代教育技术2013春第一次在线作业(国外英文资料).doc
- 中亚形势变化与中国西北边疆安全利益(国外英文资料).doc
- 中国历史中的经典口号(国外英文资料).doc
- 中国医科大学《内科学(中专起点大专)》在线作业 (16秋季)(国外英文资料).doc
- 中国民族民间舞等级考级教材(国外英文资料).doc
- 中石油北京14秋《工程力学(含模拟实验)》_模拟实验作业(国外英文资料).doc
- 专八核心词汇2000DAY4(国外英文资料).doc
- 中国高速铁路建设规划(国外英文资料).doc
- 《画法几何与土木工程制图》教学大纲(国外英文资料).doc
- 中国医科大学2015年4月内科学本科在线作业答案(国外英文资料).doc
文档评论(0)