- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
机泵操作规程(国外英文资料)
机泵操作规程(国外英文资料)
Operating procedure of machine pump
The opening, stopping and switching operation of centrifugal pump
Pump operation of centrifugal pump
The initial state S0
Centrifugal pump air condition, isolation, machine, electricity and instrument system are ready
Centrifugal pump preparation:
1.1 assist system:
1.1.1 [P] - the cooling water
State of S1
The centrifugal pump is equipped with pump conditions
1.2 centrifugal pump irrigation pump
1.2.1 room temperature pump irrigation pump
1.2.2 high temperature pump priming pump
1.2.3 air pump irrigation pump
State of S2
The centrifugal pump has the pump condition
Centrifugal pump pumps
2.1 start motor
State the S3
The centrifugal pump runs the pump
Confirm and adjust after startup
3.1 pump
3.2 power equipment
3.3 process system
3.4 supplementary operation
A final state FS
Centrifugal pump is running normally
operation
The initial state S0
Centrifugal pump air state - isolation - mechanical and electrical systems are ready
Scope of application
-- pumps driven by electricity
- room temperature pump
- heat pump
- liquefied gas pump
instructions
(P) - the pump is finished by the engine
(P) - the pump is in a state of no process
(P) - confirm that the coupling is installed
(P) - make sure the shield is installed
(P) - the pumps machine, electricity and equipment are confirmed
(P) - the pump is smooth and flexible
(P) - the pump entry filter is cleaned and installed
(P) - confirm that the cooling water is drawn to the pump
(P) - confirm the analysis of the lubricating oil test
(P) - confirm the oil in the bearing box is normal
(P) - confirm the valve closing of the pump
(P) - confirm the valve closing on the pump heating line
(P) - confirm the closing of the valve on the sealing line
(P) - confirm the pumps drain valve opens
(P) - confirm that the pumps motor switch is in or out of condition, and the interlock is removed
(P) - confirm that the pumps motor is out of power
Centrifugal pump preparation:
[P] -close the pump
您可能关注的文档
最近下载
- 王力《古代汉语》教案.doc
- 排球大单元教学计划18课时.doc VIP
- 开学第一课(课件)七年级英语上册(人教版2024).pptx VIP
- 2024年GD省生态环境监测专业技术人员大比武模拟试卷及答案-3应急监测.pdf VIP
- 鸿蒙HarmonyOS应用开发者高级认证练习题及答案01.docx
- 文献检索的方法以及技巧ppt课件.docx VIP
- 2024年某省生态环境监测专业技术人员大比武模拟试卷及答案-3应急监测.pdf VIP
- 2025年乡镇农技站高标准农田建设管理员招聘面试题库附答案.doc VIP
- 锚杆长度检测课件.pptx VIP
- 2025年乡镇农技站高标准农田建设管理员招聘面试专项练习含答案.doc VIP
文档评论(0)