- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
框架-核心筒结构高层办公楼施工组织设计(国外英文资料)
框架-核心筒结构高层办公楼施工组织设计(国外英文资料)
With abundant real estate co., LTD. Kunming office building construction project bidding and tendering construction organization design
XXXX limited office construction project
(E1-10-1 lots) earth XX bidding
Construction organization design
Organization: yunnan XX group XX construction co., LTD
one
Yunnan jiangong group 10 construction co., LTD
Orders to record
The first chapter shall be formulated and based on 6
The first section compiles principle 6
Section 2, compiling basis 6
The second chapter of the project is an overview of 10
Section 1: an overview of the tendering documents
The second section of the project is an overview of 10
Section 4 features of the engineering and key points of difficulty 11
Chapter iii construction deployment 13
Section 1, the guiding thoughts and principles of construction deployment are 13
Section 2 project construction management goal 15
Section 3 construction organization 18
Section 4, construction preparation 26
Section 5, main construction procedure 31
Chapter iv construction technology plan 36
The first engineering measurement control plan 36
Section 2 foundation foundation 45
The third section is 54
Section 4 decorate the project plan 84
Section 5 method of waterproof engineering 95
Section 6 project plan for hydropower installation is 100
Article 5 the main points of the project, the method of construction of difficulties and the control measures are 123
Section 1 basement concrete waterproof 123
Section 2 large volume, large area concrete construction 126
Section 3 aluminum plate construction 130
Chapter vi quality assurance and guarantee measures 133
Section 1 quality commitment 133
Section 2, quality assurance system 133
Section 3 quality management system 144
Section 4 technical guarantee measures 162
Section 5 quality control measures of raw materials 172
Section 6 measures for the measurement of guarantee measures 178
Section 7 the main parts of the section are the quality assurance measures
文档评论(0)