混合絮凝池安装施工方案(国外英文资料).docVIP

混合絮凝池安装施工方案(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混合絮凝池安装施工方案(国外英文资料)

混合絮凝池安装施工方案(国外英文资料) Installation plan 1.1.1. The engineering overview The mechanical equipment installation of this project consists mainly of mechanical mixer, folding box unit, submersible pump, carbon steel pipe, stainless steel pipe, distribution box, control box, etc. The installation of equipment engineering is an important condition to ensure the normal operation of the mixed flocculation pool. 1.1.2. Construction preparation 1. The technical preparation (1) familiar with the installation of machinery and equipment drawings, installation professional construction drawing, technical documents, equipment installation manual, parts assembly tolerance with technical requirements and relevant national standards, construction and acceptance standard, etc. (2) to learn about specifications and safety technical documents. (3) to investigate the supply of equipment and materials, understand the conditions of construction site and the complexity of construction technology. (4) to understand the situation of the personnel and the deployment of the machine, etc., to formulate the design and construction plan of the construction organization according to the exact data that is mastered. Labor organization preparation (1) to establish a professional construction team of lean and efficient construction, with high technical standards, difficult projects and specialized construction teams. (2) combining previous experience in construction, optimizing the construction plan, looking at the overall situation, looking at the difficult points, grasping the key, coordinating the arrangement and balancing the production. (3) according to practical need, the mutual coordination between construction group, type of work, by the project department unified scheduling, reasonable allocate labor, reduce the slowdown and labor waste phenomenon. 3. The goods ready (1) the equipment is brought to the construction site and placed in the designated location. (2) construction machinery: flat tra

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档